M&S, ABERYSTWYTH

The Challenge

Following severe storm damage, M&S Aberystwyth required urgent replacement of their external signage and steel support structure. The project demanded swift action to restore the building's frontage whilst maintaining the high standards expected of a premium retail brand, all whilst ensuring minimal disruption to trading operations.

Our Solution

Our team delivered a comprehensive signage and structural solution tailored to the specific requirements of the M&S Aberystwyth location. We implemented:


  • Rapid assessment and safety survey following the storm damage


  • Structural engineering expertise to design and fabricate replacement steel support systems


  • Bespoke signage manufacture matching M&S brand specifications


  • Coordinated installation minimising impact on store operations



  • Full compliance with building regulations and safety standards

The Results

he project was completed efficiently and to the highest standards, restoring M&S Aberystwyth's prominent high street presence. The client benefited from:


  • Rapid restoration of brand visibility and storefront appeal


  • Enhanced structural integrity with modern, durable materials


  • Improved weather resistance to prevent future storm damage


  • Minimal disruption to customer access and trading hours


  • Full project coordination from assessment through to completion

"The response was incredibly swift and professional. The team understood the urgency and delivered a solution that has restored our storefront beautifully whilst ensuring long-term durability."