M&S, ABERYSTWYTH
The Challenge
Following severe storm damage, M&S Aberystwyth required urgent replacement of their external signage and steel support structure. The project demanded swift action to restore the building's frontage whilst maintaining the high standards expected of a premium retail brand, all whilst ensuring minimal disruption to trading operations.
Our Solution
Our team delivered a comprehensive signage and structural solution tailored to the specific requirements of the M&S Aberystwyth location. We implemented:
- Rapid assessment and safety survey following the storm damage
- Structural engineering expertise to design and fabricate replacement steel support systems
- Bespoke signage manufacture matching M&S brand specifications
- Coordinated installation minimising impact on store operations
- Full compliance with building regulations and safety standards
The Results
he project was completed efficiently and to the highest standards, restoring M&S Aberystwyth's prominent high street presence. The client benefited from:
- Rapid restoration of brand visibility and storefront appeal
- Enhanced structural integrity with modern, durable materials
- Improved weather resistance to prevent future storm damage
- Minimal disruption to customer access and trading hours
- Full project coordination from assessment through to completion



